Upgrade of the Vasse Diversion Drain in Busselton, enhancing community safety through improved flood mitigation over a 6 km stretch of critical drainage infrastructure.
Project Challenges
•Managing multiple construction fronts over large distances
•Precise construction of concrete structures and sheet piling
•Maintaining accuracy across an extensive project area
•Coordinating comprehensive data capture across the site
Our Solutions
•Implemented aerial surveys for enhanced data capture
•Utilised advanced GNSS and total station surveying techniques
•Employed LiDAR scanning for precise measurements
•Provided design modelling for machine control
•Conducted as-constructed surveying to WCX DS-80 standard
Project Outcomes
•Significantly enhanced flood defence capability
•Precise execution of critical drainage infrastructure
•Improved community safety through better flood mitigation
•Successfully completed a comprehensive surveying scope